4/11/25

Passed our City of Bend inspection for demo preparations. Site is graveled and signage is installed. Pacific power has removed power from the trailer. Power is now stubbed into a ground box near the water meter. Ready to start installing Temp Power for our construction needs. (not required for demo).

Next
Next

4/8/25